Tower
Bid Package 04
- Pages
- 900
- Project
- 2024-0411
- Material
- Synthetic
The walkthrough begins where the installed product begins: with the project specifications. The sample is already prepared, and this page never accepts a real file.
Bid Package 04
Pro Spec read all 900 pages of the Omega Tower project specifications: 78 specification sections across eight divisions. It found 263 items the spec requires you to submit, and 11 places where the spec puts your bid at risk. Every one is linked to the page and paragraph it came from, so you can check it yourself.
Start with the curtain wall. Section 08 44 13 §1.05 requires a performance mockup of the curtain wall, at least two stories high and three lites wide, built for laboratory testing before fabrication. Section 01 40 00 §1.05.B assigns preconstruction testing, and the mockup it is performed on, to the Contractor. After that: door hardware specified at 24 volts where the panel schedule supplies 12, curtain wall engineering the spec makes your responsibility without naming an engineer, and a 20-year warranty that two sections describe differently.
08 44 13↔01 40 00Glazed aluminum curtain walls · Quality requirementsA full-scale mockup, at least two stories high and three lites wide, laboratory tested before fabrication. Preconstruction testing, including the mockup, is at the Contractor’s cost.
The exclusion is on page 2 of Crestline’s proposal.
1.04 · SubmittalsA. Submit manufacturer’s product data for each component of the traffic coating system, including primer, base coat, and topcoat, indicating VOC content and application rates.
All three components documented, with VOC content and application rates on each sheet.
One prepared set, built into this page. Select it to start the read.
You staged the project specifications, read the briefing, followed a two-story mockup requirement into the curtain wall bid package and saw the apparent low bidder leveled against the spec, and then, after award, checked one submittal against the line Pro Spec extracted before bid.
Synthetic project · full mock experience · nothing was uploaded